Difference between revisions of "Programme Aspect 2012"
Jump to navigation
Jump to search
m |
|||
Line 1: | Line 1: | ||
The CFP is on its way out before May 30th. Reviewed on meeting May 14th. | The CFP is on its way out before May 30th. Reviewed on meeting May 14th. | ||
− | |||
− | |||
− | |||
# Themes | # Themes | ||
Line 11: | Line 8: | ||
# Preparation and evaluation of CFP | # Preparation and evaluation of CFP | ||
# Conference booklet | # Conference booklet | ||
+ | |||
+ | |||
+ | * Ensure that a program is filled with topics that are current and interesting, within and between the fields of technology, society and culture, as per the manifesto. | ||
+ | * Ensure that external organisations coordinate tracks are kept informed of discussed in the organisation and is able to contribute their thinking. |
Revision as of 19:41, 14 May 2012
The CFP is on its way out before May 30th. Reviewed on meeting May 14th.
- Themes
- Tracks
- Keynotes
- Communication with other orgs to organise tracks
- Scheduling
- Preparation and evaluation of CFP
- Conference booklet
- Ensure that a program is filled with topics that are current and interesting, within and between the fields of technology, society and culture, as per the manifesto.
- Ensure that external organisations coordinate tracks are kept informed of discussed in the organisation and is able to contribute their thinking.