Difference between revisions of "Programme Aspect 2012"

From FSCONS wiki
Jump to navigation Jump to search
m
Line 1: Line 1:
 
The CFP is on its way out before May 30th. Reviewed on meeting May 14th.
 
The CFP is on its way out before May 30th. Reviewed on meeting May 14th.
 
* Ensure that a program is filled with topics that are current and interesting, within and between the fields of technology, society and culture, as per the manifesto.
 
* Ensure that external organisations coordinate tracks are kept informed of discussed in the organisation and is able to contribute their thinking.
 
  
 
# Themes
 
# Themes
Line 11: Line 8:
 
# Preparation and evaluation of CFP
 
# Preparation and evaluation of CFP
 
# Conference booklet
 
# Conference booklet
 +
 +
 +
* Ensure that a program is filled with topics that are current and interesting, within and between the fields of technology, society and culture, as per the manifesto.
 +
* Ensure that external organisations coordinate tracks are kept informed of discussed in the organisation and is able to contribute their thinking.

Revision as of 19:41, 14 May 2012

The CFP is on its way out before May 30th. Reviewed on meeting May 14th.

  1. Themes
  2. Tracks
  3. Keynotes
  4. Communication with other orgs to organise tracks
  5. Scheduling
  6. Preparation and evaluation of CFP
  7. Conference booklet


  • Ensure that a program is filled with topics that are current and interesting, within and between the fields of technology, society and culture, as per the manifesto.
  • Ensure that external organisations coordinate tracks are kept informed of discussed in the organisation and is able to contribute their thinking.