Difference between revisions of "Eighth planning meeting 2012"

From FSCONS wiki
Jump to navigation Jump to search
(Created page with "{{Org meeting|FSCONS2012 | date = 2012-06-11 | time = 17:30 | place = CTH Johanneberg — EDIT-room }} = Agenda = '''TBA'''")
 
m
 
(10 intermediate revisions by 2 users not shown)
Line 6: Line 6:
  
 
= Agenda =
 
= Agenda =
'''TBA'''
+
 
 +
* Keynote voting: how and when?
 +
* Graphical profile
 +
** Meeting
 +
**Idea for new logo https://www.dropbox.com/s/7dedkbefrxm7xi5/new_logo.png
 +
* Café plan presentation
 +
** Accepting bitcoins as payment in the Café?
 +
* Social event plan presentation
 +
* Hardware
 +
** Requirements?<p>We have 4 cameras + 1 streaming camera.</p>
 +
*** How many simultaneous tracks will there be?
 +
*** How many of these tracks will have a sign interpreter to be recorded as well?
 +
** Budget
 +
*** Ljudanläggning - LA400 (upp till ca:150 pers - 2800W) * 4, 150€ per set = 600€,<p>http://www.nojesgruppen.se/pa_ljud_uthyres_uthyrning.html</p>
 +
*** SHURE PG288E/PG58 60€ * 4 rooms * 3 days = 720€<p>http://www.nojesgruppen.se/mikrofoner_mickar_uthyres_uthyrning.html</p>
 +
*** cheaper price for this two on (page on Swe) http://www.lob.chs.chalmers.se/hyra.php //Erik
 +
*** Additional cameras?
 +
*** Lighting?
 +
* Other questions
 +
* Next meeting
 +
 
 +
==Summary (DRAFT, will be finalised Tuesday June 12th)==
 +
* Keynote voting
 +
'''DECISION''': Vote until end of week according to procedure on keynote page.
 +
 
 +
{{todo| LJO + GD collects the votes. Stian asks the preferred keynotes |assignedTo=Stian}}
 +
 
 +
* Graphical profile
 +
 
 +
'''DECISION''': Workshop meting with interested persons end of June, suggestion 27th. Posters should be started to be put up in mid September.
 +
 
 +
* Café aspect
 +
 
 +
'''DECISION''': Try to keep zero budget. Keep food alternatives, vegan etc, but try lower cost. Breakfast, will be selfmade this year. Beer, cut down on impopular according to previous figures. Soft drinks, 2 fridges available. Survey coop for easy participation.
 +
Investigate bitcoin, but sceptical to add another payment method. Find out how to keep people inside for higher sales.
 +
Info: More places will be open this year for hot food.
 +
 
 +
* Social aspect
 +
 
 +
'''DECISION''': 4 main alternatives. Kuggen (2 floors) is the preferred alternative. No figures yet though, but we would need to get food and equipment from them. Other alternatives, itu, gasken, bulten, berg211 (Total with transport 24', 18' for rent according to last time we used them, they provide much lower figure now 8'.). Calculate on 150-200 social event participants.
 +
 
 +
* Hardware aspect
 +
 
 +
'''DECISION''': Rent pa systems for all rooms, microphones, light, according to suggestion.
 +
Additional questions answers for convenience: Max 4 simultaneous tracks, No sign interpreter.
 +
Hardware aspect provide estimate ASAP for slides+audio equipment, e g pay shipping back and forth to Belgium.
 +
 
 +
{{todo| Come up with complete budget estimate for hardware aspect. |assignedTo=Klondike}}
 +
 
 +
* Next meeting
 +
 
 +
'''DECISION''': For interested orgs and and 1 representative per track. Audio participation possible.
 +
Monday July 30th 17.30 at Språkbanken, L307.
 +
 
 +
[[Category:FSCONS 2012]]

Latest revision as of 22:11, 29 March 2015

Meeting
Org Meeting
Date:2012-06-11
Time:17:30
Place:CTH Johanneberg — EDIT-room


Agenda

Summary (DRAFT, will be finalised Tuesday June 12th)

  • Keynote voting

DECISION: Vote until end of week according to procedure on keynote page.

TODO: Template:Trim (User:Stian)


  • Graphical profile

DECISION: Workshop meting with interested persons end of June, suggestion 27th. Posters should be started to be put up in mid September.

  • Café aspect

DECISION: Try to keep zero budget. Keep food alternatives, vegan etc, but try lower cost. Breakfast, will be selfmade this year. Beer, cut down on impopular according to previous figures. Soft drinks, 2 fridges available. Survey coop for easy participation. Investigate bitcoin, but sceptical to add another payment method. Find out how to keep people inside for higher sales. Info: More places will be open this year for hot food.

  • Social aspect

DECISION: 4 main alternatives. Kuggen (2 floors) is the preferred alternative. No figures yet though, but we would need to get food and equipment from them. Other alternatives, itu, gasken, bulten, berg211 (Total with transport 24', 18' for rent according to last time we used them, they provide much lower figure now 8'.). Calculate on 150-200 social event participants.

  • Hardware aspect

DECISION: Rent pa systems for all rooms, microphones, light, according to suggestion. Additional questions answers for convenience: Max 4 simultaneous tracks, No sign interpreter. Hardware aspect provide estimate ASAP for slides+audio equipment, e g pay shipping back and forth to Belgium.

TODO: Template:Trim (User:Klondike)


  • Next meeting

DECISION: For interested orgs and and 1 representative per track. Audio participation possible.

Monday July 30th 17.30 at Språkbanken, L307.